Why Pukete Owners Give Us the Old Slab
Six things that decide whether a replacement Pukete driveway outlasts the one it replaced.
We Check Which Soil You Have Got
Pukete sits on low bars and swales. Free-draining sandy loam on the raised ground and poorly drained silt in the hollows can occur on the same street, and sometimes on the same section. We dig a hole and look before specifying the base.
Base Dug Out, Not Poured Over
When a driveway comes out here, the base comes out with it. Basecourse that has spent fifty years under a slab and let it fail is not a foundation for the next one, whatever it looks like from the surface.
Joints Placed Where the Old Cracks Ran
Old cracks map where the slab wanted to move. We read them before setting the new joint layout, so the next slab is given permission to crack on a line we chose.
Terrace Sections Assessed Before We Cut
Sections along the Pukete river terrace sit near a free face. Council’s liquefaction study asks for particular attention to lateral spreading on land within 100 metres of a free face, so a terrace-edge job gets looked at properly before we cut anything.
Old Concrete Gone the Same Week
The demolition, the loading and the cartage happen inside the same visit as the excavation. You are not left with a stack of broken concrete on the berm waiting for a truck to come back.
Falls Surveyed Fresh on a Replacement
An old driveway that ponds does so for a reason, and repeating its levels repeats the puddle. We survey the falls fresh and take the water to a point that still works, which sometimes means a channel drain the original never had.