What a Chartwell Section Asks of a Concreter
Four things that decide whether a Chartwell job runs smoothly or turns into a problem on pour day.
Access Measured Before Anything Is Promised
We measure the narrowest point of your side access with a tape, not by eye. A 2.6 metre gate looks the same as a 2.2 metre gate from the footpath, and one of them takes a machine down the side while the other means barrowing everything.
Gully Earthworks Kept Inside the Annual Cap
Sections backing onto the Chartwell reaches of the Kirikiriroa gully sit inside the Waikato riverbank and gully hazard area, where earthworks are limited to 25 cubic metres per site per calendar year with cut and fill capped at half a metre. We check the mapped extent before quoting anything near the edge.
Impermeable Area Recalculated After a Subdivision
When a section is subdivided, the permitted impermeable area is recalculated against the new net site area, so the driveway that was compliant across the whole property may not be across the front lot. We work that out before designing the new hard surface.
Crossings Built Around Live Hukanui Road Works
Hukanui Road is being rebuilt with in-lane bus stops, protected cycle lanes, raised platforms and a signalised crossing, and the Comries Road intersection is being signalised. Where your crossing sits inside that work, we programme around it and talk to whoever holds the corridor.