What We Do Differently on Wet Rototuna North Ground
Four things that matter more on new Rototuna North ground than they do on an established section.
Subgrade Proof Rolled Before Basecourse
We proof roll the subgrade before any basecourse goes on it. If a loaded barrow leaves a rut, the material under it is not going to hold a slab flat, and that is a conversation to have before the concrete is ordered.
Builder's Fill Treated as an Unknown
Nobody hands over a compaction record with a section. We assume the fill is unproven until we have dug into it, and we price the base off what is actually there instead of what the subdivision plan says should be.
Grade 500E Mesh in Every House Slab
A house floor slab takes Grade 500E ductile mesh at 2.27 kg per square metre under the Building Code acceptable solution. The 665 mesh that is right for your driveway is not permitted in the house slab, and the two get ordered separately.
Drainage Designed for a July Water Table
Ground here is at its wettest between July and September, which is when Council expects any soakage device to still be sitting above the water table. We size drainage for the wet month, so it works in the one that matters.