Why Builders and Homeowners Pick Us for Foundations
Six things that decide whether a foundation gets signed off first time. Every one of them happens before the concrete truck arrives.
We Read the Ground Before We Price the Slab
A cleared, levelled section is not automatically good ground, and BRANZ draws that exact distinction. We look at what came off the site and what went back on before we put a number on a foundation.
Hardfill Compacted in 150 mm Layers
Compacted hardfill under a slab is capped at 600 mm and goes in at 150 mm a layer. We do it that way because one thick lift passes the eye test on the day and shows up in the floor two years later.
Grade 500E Mesh at 2.27 kg per Square Metre
Grade 500E mesh at 2.27 kg per square metre is the minimum for a slab on ground, set by the Building Code acceptable solution. Ours goes up on chairs and runs to within 75 mm of the outside edge of the slab.
The Pre-Pour Inspection Sits in Our Programme
The council inspects before concrete is poured. A missed inspection can mean work has to be undone and redone, and it can hold up sign-off on the whole build. We book it into the programme with the pour.
Damp Proof Membrane Under Every Habitable Slab
0.25 mm polythene, laps at least 150 mm wide, laid over a sand blinding so it does not get punctured on the way in. A damp proof membrane is mandatory under slabs for habitable spaces and it cannot be fixed after the pour.
We Say When a Standard Detail Will Not Work
Some sites need an engineer, and no amount of concrete substitutes for one. Where your ground needs a specific engineering design we say so before you spend money on a slab that will not get consented.